Multitech Plasto Rub Logo

Infrastructure

Our state-of-the-art manufacturing infrastructure.

25,000 sq. ft.
Factory Area
8
Production Lines
100,000+
Monthly Capacity
12-Stage
Quality Checks
Our Facilities

World-Class Infrastructure

Every aspect of our facility is designed for efficiency, quality, and scalability.

🏭

Factory Area

25,000 sq. ft.

Modern manufacturing facility with ample space for current and future production expansion.

βš™οΈ

Production Lines

8 Lines

Injection moulding machines from 100T to 500T capacity handling diverse product sizes.

πŸ“ˆ

Monthly Capacity

100,000+

Units per month with room to scale up based on demand. Dedicated lines for priority orders.

πŸ“¦

Warehouse

10,000 sq. ft.

Climate-controlled warehouse with organized bin storage for ready-stock availability.

πŸ”¬

Quality Lab

Fully Equipped

In-house testing lab with load testing, impact testing, UV testing, and dimensional inspection equipment.

πŸ”§

Mould Shop

In-House

CNC machining centre and EDM machines for custom mould design and manufacturing.

Visit Our Factory

Schedule a visit to see our infrastructure and manufacturing process in person.

Schedule a Visit
Chat with us